Building Codes, Zoning & Enviornmental Health

​The Office will be closed on Friday, November 11, 2016 for Veterans Day

 All Solar Systems are to be FULLY designed and original plans sealed by either a Missouri Registered Engineer or Architect. The plans shall be Clearly drawn as a COMPLETE system to include all foundation and/or roof connection(s). Please refer to the application packet.

Remember to allow appropriate time for the plan review process as building permits are not issued at time of application.

Email Contact Information

  • General Questions/Permit Tech
  • Codes Questions/Inspector
  • On-Site Waste Water (Septic)
  • Zoning Officer/Admin. Assistant

Manufactured Homes

Private Swimming Pools / Hot Tubs / Spas

Residential Solar Application

Drive Culvert / Entrance

Residential Generator

Right of Way Work / Road Cut or Bore Permit App